Surface Preparation
New Surface | Previously Painted Surface |
Clean the surface free from dust, oil, Metal / Steel : Eliminate any rust completely. |
Remove any deterioration/flakes of old coating,
Metal / Steel : Eliminate any rust completely. |
Coating System
Primer & Topcoat 3 IN 1 | Dilution | Drying Time |
Apply 1-2 coats for full coverage, Can apply more coats. For more protection. |
Brush, Roller : 5-10% Spray : 100-150% |
Touch Dry 5-10 Minutes. Recoat Dry 30-60 Minutes. |