Surfaces | Surface Preparation |
Metal | Metal must be dry and free from dirt, grease and other contaminants. Ferrous substrate should be sanded or wire-brushed to remove mill scales and rust then clean off and dry. |
Concrete Cement Masonry Gypsum Wood |
Surfaces must be dry and free from dirt, grease and other contaminants. Smoothen surface with sandpaper then clean off and dry. |
Outdoor sculpture Application system | ||
Primer | Top Coat | Hato Polyurethane Glitter |
Apply 1 coat of Hato Polyguard Epoxy Enamel (2K) PART A : PART B 4 : 1 by Volume Diluted with Hato Polyguard Epoxy Enamel Thinner (EPT710) Brush: 10-20% Spray gun: 100-150% by Volumn Use within 8 hours after mixing PART A with PART B |
Apply 1-2 coat of Hato Acrylic Enamel Diluted with Hato Acrylic Enamel Thinner (ACT720) Brush : 10-20% Spray gun: 100-150% by Volume Apply after primer application 6-12 hours |
Apply 1-2 coat of Hato Polyurethane Glitter (2K) PART A : PART B 4 : 1 by Volumn Diluted with Hato Polyurethane Glitter Thinner (GLT730) Brush : 10-20% Spray gun: 100-150% by Volume Use within 4 hours after mixing PART A with PART B |